Fujitsu Data Center

10,000 SF Data Center that was increasing heat load dramatically, requiring the installation of four (4) new Liebert Units as well an elaborate anchoring and grounding system for the new cabinets. The cabinets had to be seismically anchored through the raised floor into the concrete with epoxy. All new dedicated power on UPS and back-up generator was installed, all being fed under floor. Above was a cable management system to keep all cable secure and organized. In addition, a fence was erected around the new server racks and secured with a card access system. The existing clean agent gas system was modified as needed.